In-stock unit: same day
If an inventory unit fits, it can leave the lot the day you buy it — the timeline is paperwork, not production.
How delivery actually works
Local deliveries are usually included at no extra charge, and most vehicles are professionally driven to you rather than trucked. Longer hauls run roughly $2 per mile, and multi-vehicle orders can go driven or transported, whichever pencils out. Prefer to come get it? We issue a temporary tag and you drive it home off the lot — plenty of buyers fly one person in and drive back, and churches often have a member who'll donate the trip.
Built-to-order mobility van: about a week for stock packages
FR's pre-configured Pacifica packages ship in as little as a week. Custom van configurations run longer.
Built-to-order shuttle bus: 60–120 days
The spread depends on two things — chassis availability (the Ford/Chevy cutaway supply moves in waves) and configuration complexity (a standard 14-passenger layout beats a 7-wheelchair flip-seat floor with rear luggage). HLE builds every bus to order in Wakarusa, Indiana; there's no "pull one off the line." A full custom build can go as far as your branding does — up to and including a complete exterior graphic wrap. A bus is a big vehicle; wrapped, it's a rolling billboard for your organization, and we recommend it.
What you control
Decide your spec quickly (capacity, wheelchair positions, luggage, door options — we'll walk you through it in one call), and run financing in parallel, not after. Pre-qualification takes a day; doing it while the build is quoted saves two to three weeks against doing things in sequence.
What nobody controls
Chassis allocation. When a chassis year changes over, lead times stretch. If your need date is fixed — a contract start, a season opening — order backward from that date with margin, or ask what's in stock and inbound. Sometimes the smart move is the 90%-right bus available now over the 100%-right bus in four months.
Need it in under a month, shop inventory; under two months, stock van packages or inbound units; three months or more, build exactly what you want.